Network
Two heavy-haul corridors, six year-round lanes, four overseas nodes. Borders, distances, transit times and transloading arrangements on one page.
How each lane actually runs
Borders, number of transloading stops and equipment decide how long a shipment really takes. This is the answer we give customers.
| Lane | Border crossings | Indicative distance | Indicative transit | Transloading and handling | Equipment |
|---|---|---|---|---|---|
| China (Kashgar) – Iran, nationwide | Exit Irkeshtam; enter at Sarakhs | ~3,800 km | 18–20 days | Osh-Karatai and Bukhara, one stop each; container stays sealed | Chassis, curtain, flatbed, car-carrier |
| China (Kashgar) – Turkmenistan, nationwide | Exit Irkeshtam; enter at Alot | ~2,500 km | 12–15 days | Osh-Karatai and Bukhara, one stop each; container stays sealed | Chassis, curtain, flatbed, car-carrier |
| China (Kashgar) – Afghanistan (Hairatan) | Irkeshtam; Termez–Hairatan | ~2,100 km | 12–16 days | Reach inside Afghanistan ends at Hairatan; other cities not served | Chassis, curtain, flatbed, car-carrier |
| China (Kashgar) – Uzbekistan, nationwide | Irkeshtam | Tashkent ~1,300 km; Termez ~1,700 km | 10–12 days | Exit at Irkeshtam, direct to all Uzbekistan including Termez | Chassis, curtain, car-carrier |
| China (Kashgar) – Tajikistan | Karasu | ~1,000 km | 7–10 days | Exit at Karasu, direct to Dushanbe | Curtain, flatbed, car-carrier |
| China (Kashgar) – Kyrgyzstan (Bishkek) | Torugart | ~780 km | 5–7 days | Torugart border; clearance and distribution in Bishkek, via Naryn | Curtain, flatbed, chassis, car-carrier |
| China (Kashgar) – Kyrgyzstan (Osh) | Irkeshtam | ~529 km | 5–7 days | Exit at Irkeshtam, direct to Osh | Curtain, flatbed, chassis, car-carrier |
| China (Kashgar) – Pakistan | Khunjerab | ~1,280 km | 3–5 days | Transload to Pakistani trucks at Sost; Chinese trucks do not go deeper | Curtain, flatbed, car-carrier |
Distances and transit times are ranges under normal conditions. Loading to border exit takes about 4–5 days, 5–8 days when the border is congested; snow season and the situation at destination add further delay. Road freight is constrained by border throughput, so we do not guarantee fixed transit times; written confirmation and case-by-case agreement apply.
“When the border backs up, rates move daily. That is why we quote per shipment.”
Rate validity: no rate lock; generally 1 day, up to 3 days on some lanesAfghanistan: only Hairatan — and we know Hairatan well
The Afghanistan lane runs south through Osh and crosses at Termez into Hairatan, the northern rail and road gateway of Afghanistan and our only reliable handover point inside the country. Other cities are currently unreachable, and we say so plainly.
Hairatan does not handle containers: once a box reaches Hairatan it cannot be returned. The lane therefore runs mainly on curtain-side and flatbed equipment, and for containerised cargo we recommend keeping box plus cargo within 26 tonnes. The Osh–Afghanistan leg can also move by rail, combined according to volume and urgency.
- Handover point: Hairatan
- Mode: direct road, or rail to Osh plus road drayage
- Typical cargo: building materials, equipment, appliances, auto parts
- Limits: other Afghan cities unavailable; no counterfeit branded goods
Nodes and lanes
Yellow curves are operating corridors; dashed lines are rail combination legs. The map is schematic and shows connections only.
Schematic, not to geographic scale. On a phone, swipe to see the full network.
Three offices, one more in the pipeline
Things move when there are people on the ground. All three offices are staffed and handle customs liaison, transloading coordination and local distribution.
Pakistan · Sost
Tajikistan · Panj
Uzbekistan · Termez
Iran · Sarakhs
Three things we are working on
A five-country corridor. Advancing road freight from China (Kashgar) through Kyrgyzstan, Uzbekistan, Turkmenistan to Iran, and looking for backhaul cargo so the corridor works in both directions.
Yards and overseas warehouses. Cargo and container yards planned in the Kashgar bonded zone, at Irkeshtam border port and at Sarakhs in Iran; expanding warehouses in Pakistan and Tajikistan and planning a new one in Iran.
Road–rail. Continuing to develop combined road–rail services on the China (Kashgar)–Iran and –Afghanistan routes as an alternative when borders are congested.